One possible route south from Kennington. N.B. In the near future the Northern line will likely be split in 2. This extension would apply to the Charing X branch, the City branch continuing to Morden as usual. Most likely this line will be coloured lime green on the map, and either retain the Northern Line name or something else (west end line?)
Total cost, to Madrid Metro specs = 315m Euros; to JLE specs = £1.64bn
View Larger Map
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment